cs615 VU Current Assignment No. 1 Spring 2012 Solution - 10 April 2012

Tuesday, April 12, 2011 Edit This
Please doesn’t copy paste it… It’s just an idea n nothing more than it… so please make your assign by yourself. 
Thanks!

Marks: 20

Q.NO.1
Progressive elaboration is the characteristic of the project. Progressively means "developing thoroughly in steps and continuing steadily by increments" while elaborated means “worked out with care and detail, developed thoroughly” Considering the above definition, give progressive elaboration of Motorway construction project.

Solution:
A highway is any public road. In American English, the term is common and almost always designates major roads. In British English, the term (which is not particularly common) designates any road open to the public. Any interconnected set of highways can be variously referred to as a "highway system", a "highway network", or a "highway transportation system". Each country has its own national highway system.

A highway is designed exclusively for high-speed vehicular traffic, with all traffic flow and ingress/egress regulated. They are known by various terms worldwide such as motorway, parkway, expressway, etc.

Highways provide an unhindered flow of traffic, with no traffic signals and intersections (where two roads meet). They are free of any at-grade crossings with other roads, railways, or pedestrian paths. 

A highway is also known as Motorway. So don’t get confused. 

Construction techniques

The most frequent way freeways are laid out is usually by building them from the ground up after things such as forestry or buildings are cleared away. Sometimes they deplete farmland, but other methods have been developed for economic, social, and even environmental reasons.

Full freeways are sometimes made by converting at-grade expressways or by replacing at-grade intersections with overpasses; however, any at-grade intersection that ends a freeway remains. Often, when there is a two-lane undivided freeway or expressway, it is converted by constructing a twin corridor on the side by leaving a median between the two travel directions. The opposing side for the old two-way corridor becomes a passing lane.

Other techniques involve building a new carriageway on the side of a divided highway that has a lot of private access on one side and sometimes has long driveways on the other side since an easement for widening comes into place, especially in rural areas.

When a "third" carriageway is added, sometimes it can shift a directional carriageway by 50–200 ft (or maybe more depending on land availability) as a way to retain private access on one side that favors over the other. Other instances involve constructing a service drive that shortens the long driveways typically by less than 100 m.

Environmental effects:

Environmental effects are related to curiosity of the project and work with care and develop thoroughly. 

Controlled-access highways have been constructed both between urban centers and within them, leading to the sprawling suburban development found near most modern cities. 

They ideally serve to reduce travel times and accident rates, though the higher speeds have increased the severity and death rates of the collisions that do occur.

Q.NO.2

Why project procurement management is most important? Give an overview.

Solution:

Project Risk management is the systematic process of identifying, analyzing, and responding to project risk. It includes maximizing the probability and consequences of positive events and minimizing the probability and consequences of adverse events to project objectives.

Project procurement management is important because of the following factors:


  • Risk Management Planning—deciding how to approach and plan the risk management activities for a project.
  • Risk Identification—determining which risks might affect the project and documenting their characteristics.
  • Qualitative Risk Analysis—performing a qualitative analysis of risks and conditions to prioritize their effects on project objectives.
  • Quantitative Risk Analysis—measuring the probability and consequences of risks and estimating their implications for project objectives.
  • Risk Response Planning—developing procedures and techniques to enhance opportunities and reduce threats to the project’s objectives.
  • Risk Monitoring and Control—monitoring residual risks, identifying new risks, executing risk reduction plans, and evaluating their effectiveness throughout the project life cycle.
  • These processes interact with each other and with the processes in the other knowledge areas. Each process generally occurs at least once in every project.

Mgt510 Assignment No. 1

Tuesday, April 12, 2011 Edit This
Semester “Spring 2011”
“Total Quality Management (MGT 510)”
Assignment No. 01 Marks: 15

“Quality Dimensions for Products & Services”
Being the student of Total Quality Management (MGT 510) how would you assure the quality dimensions for products and services? (Marks=3)

Further you are required to determine / assure the quality in the given cases (a product and a service) by pursuing the quality assurance parameters / dimensions you learnt from course lectures.

Case no. 01
(Marks: 6)
Having a cellular phone has become a necessity rather than status symbols now days. Many types of mobiles are available in the market. They vary in brand names, price and quality. Your friend wants to buy a mobile phone and ask you to help him/her in taking the decision to purchase the new cell phone. Your friend is too much conscious about the quality of product. Now what will you recommend him/her to assure the quality of the mobile phone of two different brands available in the market.

TIP: Recall the quality assurance dimensions/criteria for a product, you learnt from course video lectures

Case no. 02
(Marks: 6)
Suppose you are doing job in a location far away from your native city. You have to travel at every weekend to meet your family. You always preferred to travel though the best busservice. Now the bus service companies have increased the fare as a result of rise in fuel prices. Due to this reason it becomes unaffordable for you to select the No. 01 bus service. You want to choose the other available bus service that is economical. So how will you compare/determinethe quality of those two bus services?

TIP: Recall the quality assurance dimensions/criteria for a service, you learnt from course video lectures

Note: Solve each question according to provided marks. Do not copy the material. Provide answer according to your analytical skills.

Important Tips
1. This Assignment can be best attempted from the knowledge acquired after watching video lecture # 1 to lecture # 08 and reading handouts as well as recommended text book.
2. Video lectures can be downloaded for free from online vu lectures.

Schedule
Opening Date and Time
11th April, 2011 At 12:01 A.M. (Mid-Night)
Due Date and Time
15th April, 2011 At 11:59 P.M. (Mid-Night)

Back to home VUsolutions

Shaadi.com: Just create ur account & find ur partner or EARN money, its reall & EASY

VUsolutions Followers (Join NOW and Get Extra Benefits)

Install LATEST toolbar having lot of features - GET solutions on Desktop

toolbar powered by Conduit
Caliplus 300x250 NoFlam VitoLiv 468x60 GlucoLo