Friday, July 15, 2011 Posted In .Final Term Exam Spring 2011 (July) Edit Thisone question was
What is service level? Generally speaking, how is service level related to the amount of safety stock held? 5 marks.
How inventory minimizes in a Just-in-Time system? 3 Mark
two questions were of supply chain management.each of 5 marks.
what measures should be taken to create effective supply chain . 5 Marks
i forget other supply chain question.
one 3 marks question was to determine slack time. 3 Marks
one was of importance of transportation method. 3 Marks
As a project manager, your project has become lengthy enough and you have to
spend more money to complete it quickly within time constraints, the activity is
known as:
► Rectifying time estimation
► Project scope creeping
► Project crashing
► Project risk management
goods?
► Supplier kanban
► Material kanban
► Withdrawal kanban
► Production kanban
requirements with projected capacity availability?
► Performance control report
► Exception report
► Load report
► Planned order report
lines at work stations?
► Gantt charts
► Load charts
► Schedule charts
of an organization's products or services are known as:
► Quality at the source
► Time based strategies
► Cost leadership strategies
► Quality-based strategies
of flights by working ahead form some point in time is following which type of
scheduling?
► Backward scheduling
► Forward scheduling
► Vertical scheduling
► Horizontal scheduling
location decision?
► Transportation
► Quality of life
► Location of new markets
► Location of raw materials
► Program Evaluation and Review Technique
► Gantt chart
► Work breakdown structure
► Critical path method
worker available, which of the following is the best option for effective scheduling
in a manufacturing firm?
► Hire more skilled labor for the job to be completed
► Workers should be trained to work on a variety of machines
► Assign labor to the next workstation irrespective of their skills
► More machines should be installed for flexibility of operations
which of the following strategy would be cost effective?
�� Chase demand strategy
�� Level capacity strategy
�� Proactive strategy
�� Mixed or hybrid strategies
• Regression analysis
• Adaptive forecasting
• Weighted moving average
• Exponential smoothing